Subscribe to Our Mailing List and Get 10% Off Your First Purchase

Free Domestic Shipping within Australia Local Pick-Up at Store@FIB

Image de diapositive

Shop Our Ajrakh New Arrivals:



Devise

Use coupon code WELCOME10 for 10% off your first order.

Cart 0

Votre commande est qualifié pour la livraison gratuite You are $0 away from free shipping.
Désolé, il semble que nous n'ayons pas assez de ce produit.

Paire avec
Est-ce un cadeau?
Sous-total Gratuit
Voir le panier
hors taxes et frais de livraison

Waste Not Want Not Quilts

We are very thankful to bring you this amazing collection of unique quilts, each hand-stitched by the Stitching Ladies of The Stitching Project as well as numbered, catalogued and hand-signed. These quilts are part of our Waste Not Want Not collaboration project with The Stitching Project using off-cuts from our clothing collections, giving them new purpose and creating employment for the team of the Project, especially during this challenging times.

All quilts are therefore made from different weight khadi (hand-spun and handwoven cotton) and light dhoti (very light cotton) to LH, medium weight and KK20, medium/heavyweight cotton hand-weave. We have also used some of our luxurious slow machine woven silk cotton to offer you some unique throws.

Most are reversible with unique hand-stitch work on either side showing the Ladies’ craftsmanship skills and their creativity as the Ladies are originally given a bag coloured strips and a file of ideas but ultimately responsible for their final designs.

Our quilts will become family heirlooms to be treasured by generations to come.

Our new quilts are one of kind:

  • Using offcuts of our collections to minimise wastage
  • Reversible
  • Numbered and hand signed by its maker
  • Handstitched

SHOP OUR QUILTS NOW

Laissez un commentaire

Veuillez noter que les commentaires doivent être approvés avant d'être affichés